Here’s Kevin and the result of a week’s worth of major effort – an entire 15′ dumpster full of clumps of aggregate and rubble, shattered and hauled by Kevin. I did two wheel barrow loads (miniscule in the face of all of this), and sifted some gravel, and the rest was all his.
Isn’t that crazy. I can’t remember what I said, but he’s cracking some suave joke, ha, as he closes the doors and drives the kids off to daycare, so that he can head to work. He’s awfully strong and effective for a dev. 🙂
Wow – that is a staggering amount of HEAVY rubble!